Text Version:
i. Determine the number of trips needed for the project.
(Needed volume) * (Estimated tons/Unit volume) =Tons of material needed
(Needed tons) / (Weight of material able to be hauled per load) = Number of trips
ii. Determine the cost needed for delivery of the material.
(Number of Loads) * (Delivery Cost per load) = Total cost for delivery
iii. Determine the total cost for material and delivery combined.
(Total cost for material) + (Total cost for delivery) = Total cost